TCH.1C-27J-2-27JG
2-8.2
) ,
) , (refer to figure
)
(Cont'd)
3.Position the cables in the pulley of the tension
adjuster (34) and connect the bolts (28 and 29),
washers (20, 27, 30 and 31), nuts (18 and 32) and
new cotter pins (19 and 33). Tighten bolts (AGE NO.
00054) to 10 thru 29 in lb.
4.Install the aileron cables (37 and 39) on the left
pulleys (36 and 38) upstream the tension adjuster.
5.Position the aileron cables (4) on the LH quadrant (3).
Lock the cables with a new cotter pins (6) (LCM NO.
00010) and (7) (LCM NO.00033 ).
6.Restore the cables by means of turnbuckles (9 and
)).
CAUTION
––––––––––––––––––––––––––––––––––
Do not perform the complete tension of
the cable.
––––––––––––––––––––––––––––––––––
7.Install the clips (8, 10, 11 and 13) then acting on the
turnbuckles (9 and 12).
8.Perform aileron fuselage cables tension (if the cable
) .
9.Remove a rigging pins (40) from the LH sector group
(41) in center wing.
10.Remove a rigging pin (5) (AGE NO. 00181) from LH
quadrant (3).
11.Remove a rigging pin (1) (AGE NO. 00181) from the
control wheel (2).
27-10-05
2-49