TCH.1C-27J-2-27JG
2-27.2
INSTALLATION. Install the Rudder actuator as
follows:
(Cont'd)
H.Hold the actuator and torque tighten to 252
÷
285
in lb two connection bolts install the cotter pinon
conenctions.
I.Remove the plugs from pipes.
J.Connect the inlet and outlet pipe hydraulic line No.
1 and No. 2 with the actuator, torque tighten the
nut that connect pipe with actuator.
K.For the two rods use the following procedure:
1.Reconnect the rod;
2.place the bush (only on input lever connection), place
the washers on connections insert the bolt on
connection and position the nut on the bolt;
3.torque tighten to 10
÷
29 in lb the bolt;
4.replace the cotter pin on the connection. Repeat this
operation for both rods.
A.Reconnect the electrical connectors.
B.Reconnect the bonding lead actuator on the
structure, position the washer, bolt and torque
tighten the nut to 44
÷
48 in lb.
C.Remove from aircraft the container with drained
fluid or wiping cloths.
(Cont'd)
27-20-20
2-234