background image
TCH.1C-27J-2-27JG
2-28.2
INSTALLATION. Install the Rudder accumulator as
follows:
(Cont'd)
CAUTION
––––––––––––––––––––––––––––––––––
Dont use the drained fluid collected to
refill hydraulic circuit because it is
contamined. Discard it.
––––––––––––––––––––––––––––––––––
F.Install the cover plate on the left fuselage side
ramp area.
FOLLOW ON MAINTENANCE:
1.Restore hydraulic power system (refer to manual
TCH.1C-27J-2-00GV
) .
2.Connect electrical power to aircraft (refer to manual
TCH.1C-27J-2-00GV
).
3.Close thermal insulation screen.
4.Enable cargo ramp control.
5.Perform the functional test:
A.RUDDER ACCUMULATOR (refer to para 
2-22
) .
27-20-25
2-243