TCH.1C-27J-2-27JG
2-30.2
INSTALLATION. For install the Rudder quadrant
proceed as follows:
(Cont'd)
L.Connect Rudder input lever and Elevator input
lever in the following way: place washer and nut
onthe connection, screw the bolt.
M.Stretch the Rudder Cables/Elevator Cables by
means of turnbuckles in the upper cargo zone
nearthe cabin (if the Rudder Cables/Elevator
Cables has been removed, Install the Rudder
Cables/ElevatorCables in accordance with
maintenance task Remove/ Install Rudder
Cables/Elevator Cables).
CAUTION
––––––––––––––––––––––––––––––––––
Do not perform the complete tension of
the cable.
––––––––––––––––––––––––––––––––––
N.Perform elevator cable tension.
O.Perform rudder cable tension.
FOLLOW ON MAINTENANCE:
1.Restore hydraulic power system (refer to manual
2.Connect electrical power to aircraft (refer to manual
3.Remove Pilot Seat (refer to manual
).
4.Close the access panels 212AZ, 212BZ, 214BZ,
213AZ, 130AH and 130AD.
27-20-35
2-254