background image
TCH.1C-27J-2-27JG
PROCEDURE:
2-41.1
ADJUSTEMENT OF CONTROL CABLES
TENSION (refer to figure 
2-36, sheet 5/5
) , (refer to
figure 
2-36, sheet 2/5
) , (refer to figure 
2-36, sheet
1/5
) and (refer to figure 
2-36, sheet 3/5
)
1.Insert a rigging pin (1 and 3) (AGE NO. 00181)
diameter 0.193 in (4.915 mm) in each of the two rear
quadrants (2 and 4) between frames 43 and 44.
2.Insert a rigging pin (6) (AGE NO. 00181) diameter
0.312 in (7.95 mm) in each of the forward quadrant
(7).
3.Lock the tension regulator (5) by means of proper tool.
4.Remove the clips (8, 9 and 13) from the turnbuckle
(10, 11 and 12) located at FR 8, FR 24 and FR 25.
5.Acting on the turnbuckles, stretch the control cables in
two mechanical linkages at a load twice (AGE NO.
00113) the expected pre-load (70 daN).
6.Remove the rigging pins (AGE NO. 00181) (1, 3 and
6) and perform 25 control sticks complete travel at
least.
7.Set the cables pre-load to 35 daN read on the
Tensiometer (AGE NO. 00113) and verify that the
rigging pins (AGE NO. 00181) (1 and 3) in the rear
quadrants (2 and 4) can be inserted freely.
NOTE
Do not leave the rigging pins inserted.
8.Unlock the tension regulator and stretch the cables so
that the regulator is positioned according to the
Equation:
Regulator Scale 
=
 [ 0.0792 x number of celsius
degrees (
°
C)] + 13, 75. Verify that the regulator is
positioned according to (refer to figure 
2-36, sheet 5/5
) .
(Cont'd)
27-30-05
2-330