TCH.1C-27J-2-27JG
2-41.1
ADJUSTEMENT OF CONTROL CABLES
TENSION (refer to figure
) , (refer to
figure
) and (refer to figure
NOTE
When the cables stretching is complete,
check that the terminal lugs are tightened on
the turnbuckle coupling with the same
number of turns. Furthermore check that no
more than 3 threads are visible on each
terminal lug.
9.Measure the clearance between all quadrants end
and the cable guard bolt for the whole elevator control
and check that is in the range 0.039 to 0.062 in (1 to
1.6 mm).
10.Install the clips (8, 9 and 13) on the turnbuckles (10,
11 and 12) located at FR 8, FR 24 and FR 25.
2-41.2
AUTOPILOT CONTROL CABLES TENSION (refer
to figure
1.Insert a rigging pin (AGE NO. 00181) (1 ) diameter
0.193 in (4.915 mm) in the left rear quadrant (2).
2.Set the winding drum cables to neutral position.
3.Remove the four clips (14, 16 and 18) from the two
turnbuckles (15 and 17).
4.Stretch the autopilot control cables (AGE NO. 00113)
by means of the turnbuckles (15 and 17).
5.Check that the control cables are stretched in
)
6.Install the four clips (14, 16 and 18) on the two
turnbuckles (15 and 17).
7.Remove a rigging pin (1) (AGE NO. 00181) from left
rear quadrant (2).
(Cont'd)
27-30-05
2-331