background image
TCH.1C-27J-2-27JG
2-50.2
INSTALLATION. The installation procedure for
elevator actuator is the following:
(Cont'd)
A.Connect the two electrical connectors to LH (RH)
actuator 11CGA (6CGA) and 11CGB (6CGB).
FOLLOW ON MAINTENANCE:
1.Bleed the actuator.
2.Perform functional tests as described in ELEVATORS
FREE DEFLECTION CHECK (refer to para 
2-39
) ,
ELEVATORS TRAVEL CHECK WITHOUT
HYDRAULIC POWER (refer to para 
2-39
) ,
MANOUVRE EFFORT AND Q-FEEL FUNCIONAL
CHECK and NORMAL OPERATING (AIR DATA
VALID) (refer to para 
2-53
) .
3.Remove the container with the drained fluid from the
aircraft.
CAUTION
––––––––––––––––––––––––––––––––––
Don 't use the drained fluid collected to
refill the hydraulic circuit. It is
contaminated.
––––––––––––––––––––––––––––––––––
4.Enable cargo ramp.
5.Remove the warning target from the flight
compartment.
27-30-25
2-424