TCH.1C-27J-2-27JG
2-50.2
INSTALLATION. The installation procedure for
elevator actuator is the following:
(Cont'd)
A.Connect the two electrical connectors to LH (RH)
actuator 11CGA (6CGA) and 11CGB (6CGB).
FOLLOW ON MAINTENANCE:
1.Bleed the actuator.
2.Perform functional tests as described in ELEVATORS
) ,
) ,
) .
3.Remove the container with the drained fluid from the
aircraft.
CAUTION
––––––––––––––––––––––––––––––––––
Don 't use the drained fluid collected to
refill the hydraulic circuit. It is
contaminated.
––––––––––––––––––––––––––––––––––
4.Enable cargo ramp.
5.Remove the warning target from the flight
compartment.
27-30-25
2-424