background image
TCH.1C-27J-2-27JG
2-63.1
REMOVAL. Remove elevator accumulator as
follows:
(Cont'd)
NOTE
Perform step I for LH side.
Perform step J for RH side.
C.Release the nitrogen pressure from both hydraulic
accumulators and check the completely
dischargement on both manometers.
D.Release the nitrogen pressure from the hydraulic
accumulator and check the completely
dischargement on the manometer.
E.Unscrew nut and disconnect the nitrogen pipe.
F.Unscrew nut and disconnect inlet and outlet pipes.
G.Disconnect the electrical connector.
H.Hold the accumulator and loose the clamps.
I.Remove the accumulator from the support. Collect
the clamps.
J.Discard O-rings.
2-63.2
INSTALLATION. Install elevator accumulator as
follows:
(Cont'd)
27-30-70
2-503