background image
TCH.1C-27J-2-27JG
2-63.2
INSTALLATION. Install elevator accumulator as
follows:
(Cont'd)
H.Install the cover plate on the left (right) fuselage
side ramp area.
FOLLOW ON MAINTENANCE:
1.Close thermal insulation screen.
2.Remove maintenance platform (AGE NO. 00074).
3.Enable cargo ramp and cargo door funciton.
4.Connect electrical power to aircraft (refer to manual
TCH.1C-27J-2-00GV
).
5.Restore hydraulic power system (refer to manual
TCH.1C-27J-2-00GV
) .
6.Perform the funcional test HYDRAULIC
ACCUMULATORS SHUT-OFF VALVE CHECK(refer
to para 
2-49
) .
27-30-70
2-505