background image
TCH.1C-27J-2-27JG
2-72.2
INSTALLATION (refer to figure 
2-66
) (Cont'd)
14.Check that pushing the Flap Flanged Rigid Shaft No.
4 (1 and 3) all on one side and then from the other,
the groove in the opposite side is engaged for at least
14 mm in the related connection.
FOLLOW ON MAINTENANCE:
1.Close the access panels 553A, 553B and 553C.
2.Setting flap position up.
3.Close access door 885A.
4.Remove emergency stair.
5.Remove maintenance platform (AGE NO. 00074).
6.When installation is complete perform FLAPS
FUNCTIONAL CHECK (refer to para 
2-65
) .
27-50-35
2-585