background image
TCH.1C-27J-2-27JG
2-76
BUNGEE BETWEEN PULLEY AND HYDRAULIC
ACTUATOR - REMOVAL AND INSTALLATION
INPUT CONDITION:
Aircraft Applicability:
04162, 04180
Required Conditions:
1.Disconnect electrical power from aircraft (refer to
manual 
TCH.1C-27J-2-00GV
).
2.Isolate hydraulic power (refer to manual
TCH.1C-27J-2-00GV
).
3.Position maintenance platform (AGE NO. 00074).
4.Open the access panels 553A, 553B, 553C and 621N.
Recomended Personnel:
PROCEDURE
MECH.
CODE
QTY
TOTAL TIME
(MIN.)
WORK
ZONE
Input Condition
AFM
1
30,00
Removal
AFM
1
10,00
Installation
AFM
1
15,00
Follow
Maintenance
AFM
1
30,00
Periodicity: AR - AS REQUIRED
Total Maintenance Time: 85 (Min.)
Total Time Detention System:
85 (Min.)
AGE Required:
AGE
No.
NOMENCLATURE
P/N
00074
Kit, aircraft assy platform
G0005100001
00181
Kit, flight controls rigging
pins
11G001-C052200-801
27-50-55
2-604