background image
TCH.1C-27J-2-27JG
FOLLOW ON MAINTENANCE:
1.Close the access panels 913H, 913I, 913B, 913A and
621N.
2.Restore hydraulic power system (refer to manual
TCH.1C-27J-2-00GV
).
3.Connect electrical power to aircraft (refer to manual
TCH.1C-27J-2-00GV
).
4.Perform the functional test LIFT DUMPER CONTROL
SYSTEM (refer to para 
2-84
).
27-60-25
2-698