TCH.1C-27J-2-27JG
2-93.1
(refer to figure
5.Loosen the cable end (7) from the cable (5).
6.Loosen the nuts (7 and 16) that lock the sheats (8 and
17) to the support at FR42 (6) and FR44 (14).
7.Extract the cable (5) and remove the sheats (8 and
17).
2-93.2
INSTALLATION (refer to figure
)
and (refer to figure
WARNING
––––––––––––––––––––––––––––––––––
PERSONNEL AND EQUIPMENT SHALL
REMAIN CLEAR OF CARGO RAMP AND
DOOR AREA WHENEVER THE
AUXILIARY HYDRAULIC SYSTEM IS
PRESSURIZED. FAILURE TO COMPLY
COULD INJURY PERSONNEL OR
DAMAGE.
––––––––––––––––––––––––––––––––––
1.Position the sheaths (8 and 17) and insert the cable
(5).
2.Tighten the two cable ends (AGE NO. 00054) (15 and
22) on the cable (5).
3.Tighten the nuts (AGE NO. 00054) (7 and 16) that
lock the sheats (8 and 17) to the support at FR42 (6)
and FR44 (14).
4.Connect the cable end (15) at the elevator locking
lever assembly (10) by using bolt (9), washer (11),
castellated nut (13) and new cotter pin (12) (LMC NO.
00022).
5.Connect the cable end (22) at the bellcrank assy (21)
at frame 42 by using bolt (23), washer (20),
castellated nut (19) and new cotter pin (18) (LMC NO.
00022).
(Cont'd)
27-70-05
2-711