TCH.1C-27J-2-27JG
2-93.2
INSTALLATION (refer to figure
)
and (refer to figure
6.Install the clips (1 and 4), then acting on the
turnbuckles (2 and 3).
FOLLOW ON MAINTENANCE:
1.Close thermal insulation screen.
2.Restore hydraulic power (refer to manual
3.Connect electrical power to aircraft (refer to manual
4.Perform the functional test:
).
B.UNLOCKING CONTROLS CHECK (refer to para
).
C.ADJUSTMENT AND CHECK OF UNLOCKING
POSITION (refer to para
27-70-05
2-712