TCH.1C-27J-2-29JG
2-8.1
(refer to figure
) (Cont'd)
CAUTION
––––––––––––––––––––––––––––––––––
Install protection caps on the
disconnected electrical connectors and
hoses.
––––––––––––––––––––––––––––––––––
1.Connect hydraulic test stand (AGE NO. 00262) to No.
1 (No. 2) system pressure and suction ground test
sockets (ground service panel).
2.Using the hydraulic test stand (AGE NO. 00262),
discharge the hydraulic reservoir system No. 1 (No.
2).
3.Verify that the reservoir (2) is empty through the visual
fluid level indicator.
4.Disconnect the electrical connector (12) on the
reservoir level transmitter (11).
5.Use a container to collect drained fluid (about 1 litre).
6.Loose the return union (14), remove the lock wire
(42), open the reservoir drain cock (41) and discharge
the remaining hydraulic fluid.
7.Close reservoir drain cock (41).
8.Disconnect drain pipe (44) from the reservoir (2).
9.Disconnect the clamps (45 and 20) connecting the
draining pipe (44) to the hydraulic accumulator
sensing pipe (19) by removing screw (17), flat washer
(18) and self locking nut (46). Discard removed self
locking nut.
10.Remove the draining pipe (44).
11.Disconnect the ACMP and EDP drain ports pipe (28
and 35) from the case drain filter (32).
12.Disconnect the suction port (leading to EDP) from the
TEE union (36) on the reservoir (2).
(Cont'd)
29-10-05
2-52