TCH.1C-27J-2-29JG
2-8.2
INSTALLATION (refer to figure 
2-6, sheet 1/2
) and
(refer to figure 
2-6, sheet 2/2
) (Cont'd)
2.Cut the lock wires (39 and 9), loosen the filter bowls
(40 and 8) and check the presence of filter elements.
3.Position the reservoir (2) into the rear side of the LH
(RH) nacelle and connect it to the structure supports
fastening the bolts of two connecting clamps (1 and 3)
with a torque value of 50 in lb (0.6 m kg) (AGE NO.
00054).
4.Connect air bleeding pipe (16). Torque tighten to 120
inlb thru 135 inlb (1.4 mkg thru 1.6 mkg) (AGE NO.
00054).
5.Position pressurization pipe (4) and connect one side
to the Tee (47) on the pressurization line and the
other side to the reservoir HP port. Torque tighten to
135 inlb thru 190 inlb (1.6 m kg thru 2.2 mkg) (AGE
NO. 00054).
6.On the return filter (7) on the reservoir return line
connect the return pipe (15). Torque tighten to 3,1
mkg thru 4,0 mkg (270 inlb thru 350 inlb) (AGE NO.
00054).
7.Connect the suction port to the TEE union (36) on the
reservoir (2). Torque tighten to 5,3 mkg thru 6,3 mkg
(460 inlb thru 550 inlb) (AGE NO. 00054).
8.Position suction pipe (35) and connect the suction port
(from EDP) to the reservoir (2). Torque tighten to 8,1
mkg thru 9,7 mkg (700 inlb thru 840 inlb) (AGE NO.
00054).
9.Connect the wig-o-flex (21) to the other side of suction
pipe (EDP) (35).
10.Connect the jumper (24) using screw (27), flat
washers (26, 25 and 23) and new self locking nut (22)
(LCM NO. 00015).
(Cont'd)
29-10-05
2-55