TCH.1C-27J-2-29JG
2-8.2
) and
(refer to figure
) (Cont'd)
11.On the case drain filter (32), on the reservoir case
drain line, connect the ACMP and EDP case drain
ports pipes (28 and 35). Torque tighten the ACMP
port to 1,6 mkg thru 2,2 mkg (135 inlb thru 190 inlb)
(AGE NO. 00054). Torque tighten the EDP port to 1,7
mkg thru 2,2 mkg (150 inlb thru 195 inlb) (AGE NO.
00054).
12.Position and connect the draining pipe (44) to the
reservoir (2). Torque tighten to 1,7 mkg thru 2,2 mkg
(150 inlb thru 195 inlb) (AGE NO. 00054).
13.Tighten the clamps (45 and 20) connecting the
draining pipe (44) to the hydraulic accumulator
sensing pipe (19) using screw (17), flat washer (18)
and new self locking nut (46) (LCM NO. 00015).
14.Connect electrical connector (12) on the reservoir
level transmitter (11).
15.Fill case drain and return filter bowls (40 and 8) with
clean hydraulic fluid (LCM NO. 00043).
16.Torque tighten the return filter bowl (8) to 354 in lb
thru 443 in lb (4.1 m kg thru 5.1 m kg) (AGE NO.
00054) and restore lock wire.
17.Torque tighten the case drain filter bowl (40) to 283 in
lb thru 336 in lb (3.3 m kg thru 3.9 m kg) (AGE NO.
00054) and restore lock wires (39 and 9).
FOLLOW ON MAINTENANCE:
1.Connect hydraulic test stand (AGE NO. 00262) to No.
1 ( No. 2) system pressure and suction ground test
sockets (ground service panel).
2.Set up the hydraulic test stand (AGE NO. 00262) as
follows: delivery pressure 900 psi (63.3 kg/cm
²
).
29-10-05
2-56