background image
TCH.1C-27J-2-29JG
2-13.2
INSTALLATION (refer to figure 
2-11
) (Cont'd)
15.Disconnect the hand pump hydraulic stand (AGE NO.
00264) delivery from ACMP1 (ACMP2) delivery quick
disconnection.
16.Connect ACMP1 (ACMP2) delivery pipe through quick
disconnection.
FOLLOW ON MAINTENANCE:
1.Perform the FUNCTIONAL TEST OF ALTERNATE
CURRENT MOTOR PUMP ACMP 1 (ACMP 2) (refer
to para 
2-17
) .
2.Check for absence of leakage and verify that the HP
filter clogging indicator is not popping out.
3.Close the access panels 913A and 913B (923A and
923B).
29-10-10
2-88