background image
TCH.1C-27J-2-29JG
2-24.1
REMOVAL (refer to figure 
2-22, sheet 1/2
) (Cont'd)
CAUTION
––––––––––––––––––––––––––––––––––
Be careful when you disconnect the
outlet pipe nut. A gross hydraulic fluid
leakage may occur. Be ready to cap the
pipe as soon an possible
––––––––––––––––––––––––––––––––––
5.Remove the check valve (3).
2-24.2
INSTALLATION (refer to figure 
2-22, sheet 1/2
)
1.Install the check valve (3). Verify correct valve
orientation.
NOTE
Remove the protection cups from the pipes
that you connect.
2.Install the pipes (2 and 4) to the check valve (3).
Torque tighten (AGE NO. 00054) to 143 in lb thru 215
in lb (1.6 mKg thru 2.4 mKg).
3.Connect the clamps (1 and 5) by using screws (7 and
9) and washers (6 and 8).
FOLLOW ON MAINTENANCE:
1.Select the ACMP 1 switch to ON position.
WARNING
––––––––––––––––––––––––––––––––––
ENSURE THAT THE ELEVATOR IS FREE
IN MOVEMENT AND DO NOT CAUSE
INJURY TO PERSONNEL.
––––––––––––––––––––––––––––––––––
2.Operate twenty times the elevator.
3.Check for absence of leakage.
4.Select the ACMP 1 switch (10) to OFF position (refer
to figure 
2-22, sheet 2/2
) .
29-10-35
2-169