background image
TCH.1C-27J-2-29JG
PROCEDURE:
NOTE
Aim of the test described in this paragraph is
to verify the correct electro-hydraulic
functionality of the Hydraulic System.
NOTE
This procedure is valid for left nacelle. For
right nacelle is similar.
2-26.1
FUNCTIONAL TEST OF FIRE SHUT-OFF
VALVES - FUNCTIONAL TEST (refer to figure
2-24, sheet 1/3
) , (refer to figure 
2-24, sheet 2/3
)
and (refer to figure 
2-24, sheet 3/3
)
WARNING
––––––––––––––––––––––––––––––––––
TO PREVENT INJURY TO PERSONEL DO
NOT ROTATE THE FIRE HANDLE. ONLY
PULL OUT THE FIRE HANDLE.
––––––––––––––––––––––––––––––––––
WARNING
––––––––––––––––––––––––––––––––––
OPEN THE CIRCUIT BREAKERS FIRE
ENGINES EXTG 1 (1WE) (3) AND FIRE
ENGINES EXTG 2 (2WE) (4) LOCATED ON
OVERHEAD CIRCUIT BREAKERS PANEL
(271VE) IN POSITIONS D 21 AND D 23
AND THE CIRCUIT BREAKERS FIRE
EXTG ENG 1 (3WE) (7) AND FIRE EXTG
ENG 2 (4WE) (8) LOCATED ON REAR MID
CIRCUIT BREAKERS PANEL (451VE) IN
POSITIONS K 11 AND K 12.
––––––––––––––––––––––––––––––––––
(Cont'd)
29-10-40
2-179