background image
TCH.1C-27J-2-29JG
2-31.1
REMOVAL (refer to figure 
2-29
) (Cont'd)
8.Loosen the screws (11) and washers (10) from pump
contactor (16 DE) (14).
9.Remove the pump contactors (14 and 15).
2-31.2
INSTALLATION (refer to figure 
2-29
)
1.Position the ACMP1 (ACMP2) pump contactors (14
and 15).
2.Tighten the screws (11) and washers (10) at the pump
contactor (16 DE) (14).
3.Tighten the screws (3) and washers (4) at the pump
contactor (15 DE) (15).
4.Connect the outlet cables (6 and 13) and the nuts (5
and 12).
5.Connect the inlet cables (2 and 8) and the nuts (1 and
9).
NOTE
Remove protection caps from the electrical
connectors to be installed.
6.Connect connector (16 DEA) (7) at the pump
contactor (16 DE) (14).
7.Connect connector (15 DEA) (16) at the contactor (15
DE) (15).
8.Install the Velcro cover.
9.Remove the stepladder (AGE NO. 00076) from
working area.
FOLLOW ON MAINTENANCE:
1.Connect the external electrical supply (refer to manual
TCH.1C-27J-2-00GV
).
2.Perform the FUNCTIONAL TEST OF ALTERNATE
CURRENT MOTOR PUMP ACMP 1 (ACMP 2) (refer
to para 
2-17
).
29-10-60
2-211