TCH.1C-27J-4
Ignition - Job Guide
Engine Air - Fault Isolation
Engine Air - General System
Engine Air - General System
Engine Control System - Fault Isolation
Engine Control System - General System
Engine Control System - Job Guide
Engine Indication - Fault Isolation
Engine Indication - General System
Engine Indication - Job Guide
Engine Exhaust - General System
Engine Exhaust - Job Guide
Engine Oil - Fault Isolation
Engine Oil - General System
Engine Oil - Job Guide
Start - Fault Isolation
Start - General System
Start - Job Guide
Structural Repair Manual
Non Destructive Inspection
Basic Weight Data Check List
Loading Data
Inspection Requirements
Acceptance and Functional Check Flight Procedure
Acceptance and Functional Check Flight Checklist
Work Cards
Cargo Loading and Offloading Manual
Load Master Checklist
Some breakdown parts of Suppliers furnished equipments have been included in this Aircraft IPC,
even if they should be preferably included into the equipments separate publications, because they
are enclosed in the contractual recommended Spare Parts List, needed to support the operational
Customer requirement and the relevant applicable maintenance actions.
1-2 Structure of this Manual
This Illustrated Parts Catalogue consists in the following parts:
-
Section I
Introduction
-
Section II
Illustrated Parts Data
-
Section III
Cross Reference Index
1-3 Section II - Maintenance Parts List
The Illustrated Parts Catalogue data are compiled in order to present an engineering breakdown of
the Product in disassembly sequence, identifying all assemblies and their individual components,
together with other detail parts which cannot be assigned to assemblies, in accordance with their
Engineering Drawings and Bills of Material (BOM).
The hierarchical breakdown is reflected in the structure of the IPC data, which shows the
engineering relationship of assemblies and their parts, listing the item in order of breakdown. The
sequence of these items is given by the use of the Catalogue Sequence Number (CSN).
The level to which this breakdown is prepared is in function of the Maintenance, Repair and
Overhaul activies to be carried out on the equipment described in the present publication and by
taking into consideration the Logistic Support Analysis results and other engineering indications.
INTRODUCTION
1-5