background image
TCH.1C-27J-2-27JG
FOLLOW ON MAINTENANCE:
1.Close the access panels 130AD, 130AE, 130AH and
130AG.
2.Remove maintenance platform (AGE NO. 00074).
3.Connect electrical power to aircraft (refer to manual
TCH.1C-27J-2-00GV
).
4.Restore Hydraulic power system (refer to manual
TCH.1C-27J-2-00GV
) .
5.Perform the required test and adjustment:
A.When installation is completed adjust fuselage
control cables tension (refer to para 
1-12
).
27-10-05
2-55