background image
TCH.1C-27J-2-27JG
2-10.1 REMOVAL (refer to figure 
1-6, sheet 1/6
) , (refer to
figure 
1-6, sheet 2/6
) , (refer to figure 
1-6, sheet
3/6
) , (refer to figure 
1-6, sheet 4/6
) , (refer to figure
1-6, sheet 5/6
) and (refer to figure 
1-6, sheet 6/6
)
(Cont'd)
14.Remove fairleads (52 and 59) by removing bolts (50
and 57), washers (51, 53, 55, 58, 60 and 62) and self
locking nuts (54, 56, 61 and 63). Discard removed self
locking nuts.
15.Remove the cables (3 and 4).
2-10.2 INSTALLATION (refer to figure 
1-6, sheet 1/6
) ,
(refer to figure 
1-6, sheet 2/6
) , (refer to figure 
1-6,
sheet 3/6
) , (refer to figure 
1-6, sheet 4/6
) , (refer to
figure 
1-6, sheet 5/6
) and (refer to figure 
1-6, sheet
6/6
)
1.Install the cables (3 and 4) on the groove of the LH
pulley (27) and aft pulley (42).
2.Connect fairleads (52 and 591) by using bolts (50 and
57), washers (51, 53, 55, 58, 60 and 62) and new self
locking nuts (54, 56, 61 and 63) (LMC NO. 00011).
3.Install cables (3 and 4) on pulley (1 and 2).
4.Connect the cables (3 and 4) with turnbuckles (16 and
19).
CAUTION
––––––––––––––––––––––––––––––––––
Do not perform the complete tension of
the cable.
––––––––––––––––––––––––––––––––––
5.Install the cables (3 and 4) on the tension regulator
pulley (10) and pulleys (11, 12, 13 and 14).
6.Insert in the RH sector assy (21) the new cotter pin
(22) (LCM NO 00033).
7.Insert in the LH sector assy (7) the new cotter pin (9)
(LCM NO 00010).
(Cont'd)
27-10-05
2-63