TCH.1C-27J-2-27JG
2-19.2 CONTROL WHEEL CABLE STIFFNESS CHECK
(refer to figure
) , (refer to figure
) (Cont'd)
9.Repeat the procedure from steps 4. to 5. by loading
the Pilot control wheel ( to check the interconnection
line ) and verify the results are the same.
10.Remove the tools previously installed from the Pilot
control wheel the rigging pin and the differential
control levers locking tool.
FOLLOW ON MAINTENANCE:
None
27-10-15
2-150