background image
TCH.1C-27J-2-27JG
FOLLOW ON MAINTENANCE:
1.Connect electrical power to aircraft (refer to manual
TCH.1C-27J-2-00GV
).
2.Restore hydraulic power system (refer to manual
TCH.1C-27J-2-00GV
) .
3.Install Pilot seat (refer to manual 
TCH.1C-27J-2-25JG
).
4.Enable Cargo Ramp.
5.Close the access panels 211DZ, 322E, 322B and
130AD.
6.Remove maintenance platform (AGE NO. 00074).
7.Close secondary insulation panels in left side rear
fuselage.
8.Perform the functional test:
A.RUDDER CONTROL SYSTEM (refer to para 
1-29
)
.
B.FRICTION MANOUVRE EFFORT AND
BREAK-OUT CHECK (refer to para 
1-29
) .
C.RUDDER FREE TRAVEL CHECK (refer to para
1-29
) .
D.CHECK OF RETURN TO NEUTRAL POSITION
(refer to para 
1-29
).
27-20-05
2-209