background image
TCH.1C-27J-2-27JG
FOLLOW ON MAINTENANCE:
1.Close the access panel 322E.
2.Remove maintenance platform (AGE NO. 00074).
3.Restore external hydraulic power (refer to manual
TCH.1C-27J-2-00GV
) .
4.Connect electrical power to aircraft (refer to manual
TCH.1C-27J-2-00GV
).
5.Perform required:
A.RUDDER CONTROL SYSTEM (refer to para 
1-29
)
.
27-20-20
2-238