TCH.1C-27J-2-27JG
2-31.2 INSTALLATION. For install the Rudder quadrant
proceed as follows: (Cont'd)
D.Position the Assembly on the aircraft.
E.Install the two bolts fixing the rudder quadrant
support assembly with aircraft structure, then
torquetighten the bolts.
F.Insert a thickness to stop the pulley rotation.
G.Position the L elevator cable on the L elevator
tension regulator, then insert the two cotter pins
inorder to fix cable with elevator tension regulator.
H.Position the rudder cable on the rudder quadrant,
then insert the two cotter pins in order to fix the
rudder cable with quadrant.
I.Install the two guide on the Rudder quadrant.
J.Position the washer, insert the bolt, then position
the nut and torque tighten the bolt.
K.Remove the thickness.
L.Connect Rudder input lever and Elevator input
lever in the following way: place washer and nut
onthe connection, screw the bolt.
M.Stretch the Rudder Cables/Elevator Cables by
means of turnbuckles in the upper cargo zone
nearthe cabin (if the Rudder Cables/Elevator
Cables has been removed, Install the Rudder
Cables/ElevatorCables in accordance with
maintenance task Remove/ Install Rudder
Cables/Elevator Cables).
CAUTION
––––––––––––––––––––––––––––––––––
Do not perform the complete tension of
the cable.
––––––––––––––––––––––––––––––––––
N.Perform elevator cable tension.
O.Perform rudder cable tension.
27-20-35
2-255