TCH.1C-27J-2-27JG
2-42.1 ELEVATORS FREE DEFLECTION CHECK (refer
to figure
8.Put the double side adhesive tape on the top surface
of the elevator, non in contact with its rivets, and
position on it the digital inclinometer (AGE NO.
00061), parallel to the template.
9.With the elevators in neutral position reset the
inclinometer, then remove the template.
10.Starting from right elevator to neutral position, move
by hand the right surface fully upward and fully
downward and check that the travel is 27.5 ° +0.5° /
-0° in both conditions, without interferences.
NOTE
If the above travel values are not reached,
adjust properly the end stop screws (located
on the stabilizer) in order to satisfy the
requirements. If necessary, perform the wire
locking of the end stop screw.
2-42.2 ELEVATORS TRAVEL CHECK (refer to figure
)
and (refer to figure
1.Supply the hydraulic pressure to 3000 psi (210
Kg/cm²) and set the flowrate to 25 lt/min (6.6 gpm)
applied to the aircraft.
2.Connect the external electrical feeder (AGE NO.
00117) to the aircraft and switch-on.
3.On the Overhead Circuit Breaker Panel (271VE) (1),
ensure that following circuit breakers are closed:
FLIGHT CONTROL RUDDER TRIM CNTR (1CC)
position F 1 (2) and FLIGHT CONTROL Q FEEL
RTLU PWR (2CG) position F 10 (3) to feed the left
and right channels of the Electronic Control Unit.
(Cont'd)
27-30-00
2-323