background image
TCH.1C-27J-2-27JG
D.Perform from 4 to 6 complete monoeuvres at by
the pilot control stick in pitch direction (from neutral
to fully forward, the to fully backwards and
returning to neutral) in order to dicharge the
elevator system No. 1 accumulator.
E.Select the AIR SPEED switch (FCS2 Control
Panel) to AUTO position.
F.Move by hand the pilot control stick fully forwards,
the fully backwards and check tha the elevator
control sufaces move.
G.Move by hand yhe copilot control stick fully
forwards, then fully backwards and checck that the
elevator control surfaces moves.
H.Restore hydraulic pressure in the system No. 1
and No. 2.
FOLLOW ON MAINTENANCE:
None
27-30-00
2-332