background image
TCH.1C-27J-2-27JG
2-45.2 INSTALLATION (refer to figure 
1-49, sheet 1/4
) ,
(refer to figure 
1-49, sheet 4/4
) , (refer to figure
1-49, sheet 2/4
) and (refer to figure 
1-49, sheet 3/4
) (Cont'd)
13.Position the LH (RH) elevator cables (23 and 62) on
the LH (RH) elevator tension regulator (19 and 58),
then insert the new cotter pins (LCM NO. 00010 and
LCM NO. 00012) (20, 28, 59 and 67) in order to fix
cables (23 and 62) with elevator tension regulator (19
and 58).
NOTE
Perform steps 14 and 15 to install Pilot
tension regulator else go to step 16.
14.Position the rudder cables (13 and 38) on the rudder
quadrant (12), then insert the new cotter pins (LCM
NO. 00010) (18 and 32) in order to fix the rudder
cables (13 and 38) with quadrant (12).
15.Position the cable guards (15 and 35) on the forward
rudder quadrant (12) and insert the bolts (14 and 36)
the washers (16 and 34) and new self-locking nuts
(LCM NO. 00011) (17 and 33). Torque (AGE NO.
00054) and tighten 25 to 28 in lb ( 0.28 to 0.32 mkg)
the self-locking nuts.
16.Position the nut, washer and screw and tighten (AGE
NO. 00054) 25 to 28 in lb ( 0.28 to 0.32 mkg) the
flanged guard pins (69 and 71).
17.Repeat the operation for the opposite side.
NOTE
Perform step 18, 19 and 20 to install Pilot
tension regulator else go to step 21.
18.Perform cables tension with a manual tension
regulator acting to the turnbuckles (1 and 2) of the two
sides of the rudder line acting alternatively on the
turnbuckles (1 and 2).
(Cont'd)
27-30-05
2-348