background image
TCH.1C-27J-2-27JG
2-46.2 INSTALLATION. Proceed as follows:
A.Install the new elevator cable.
B.Install the cable on the rear LH (RH ) Elevator Rear
Quadrant and insert the two cotter pins inorder lo
fix the cable to the rear quadrant.
C.Install the cable on the LH (R H) Elevator Tension
Regulator and insert the two cotter pins in orderlo
fix the cable to the Elevator Tension Regulator.
D.Install the two fairleads in the following way:
-Install the fairlead, position the washers, insert
the bolts and turn the nuts.
E.By means of turnbuckles stretch the elevator cable.
CAUTION
––––––––––––––––––––––––––––––––––
Do not perform the complete tension of
the cable.
––––––––––––––––––––––––––––––––––
FOLLOW ON MAINTENANCE:
1.Perform Elevator Cable Tension.
2.Perform the functional test:
A.MANOUVRE EFFORT AND Q-FEEL
FUNCTIONAL CHECK (refer to para 
1-77
) .
B.CHECK OF RETURN TO NEUTRAL POSITION
(refer to para 
1-62
).
C.ADJUSTMENT OF NEUTRAL POSITION (refer to
para 
1-62
) .
D.ELEVATOR CONTROL SYSTEM (refer to para
1-58
), (refer to para 
1-62
) and (refer to para 
1-67
).
3.Close thermal insulation screen.
4.Install Pilot (Copilot) seat (refer to manual
TCH.1C-27J-2-25JG
).
5.Close the access panels:
A.212AZ (212EZ).
27-30-05
2-357