TCH.1C-27J-2-27JG
2-54.2 INSTALLATION. The installation procedure for
elevator actuator is the following: (Cont'd)
H.On the both bolts; place a washer, a nut, torque
tighten to 43 thru 50 in lb (0.495 รท 0.576 mkg)and
install the relative cotter pin.
I.Remove the caps from pipes.
J.Connect the inlet and outlet flexible pipes of the
hydraulic system No 1 and hydraulic system No2,
tighten the nuts that connect the four flexible pipes
to hydraulic actuator.
K.Connect the input lever to actuator as follow:
1.place the bushing to appropriate seat,
2.align the holes,
3.insert the bolt, the washers and the nut,
4.screw and tighten to 43 thru 50 in lb (0.495 thru 0.576
mkg) and insert the cotter pin.
A.Connect the centering spring lever to actuator as
follow:
5.insert the bushing on the roller bearing,
6.align the holes,
7.insert the bolt, the washers and the nut, screw and
tighten to 18 thru 20 in lb (0.207 thru0.230 mkg).
A.Connect the two electrical connectors to LH (RH)
actuator 11CGA (6CGA) and 11CGB (6CGB).
FOLLOW ON MAINTENANCE:
1.Bleed the actuator.
2.Perform functional tests as described in ELEVATORS
FREE DEFLECTION CHECK (refer to para
) ,
ELEVATORS TRAVEL CHECK WITHOUT
HYDRAULIC POWER (refer to para
) ,
MANOUVRE EFFORT AND Q-FEEL FUNCIONAL
CHECK and NORMAL OPERATING (AIR DATA
) .
27-30-25
2-430