TCH.1C-27J-2-27JG
NOTE
Perform step I for LH side.
Perform step J for RH side.
C.Release the nitrogen pressure from both hydraulic
accumulators and check the completely
dischargement on both manometers.
D.Release the nitrogen pressure from the hydraulic
accumulator and check the completely
dischargement on the manometer.
E.Unscrew nut and disconnect the nitrogen pipe.
F.Unscrew nut and disconnect inlet and outlet pipes.
G.Disconnect the electrical connector.
H.Hold the accumulator and loose the clamps.
I.Remove the accumulator from the support. Collect
the clamps.
J.Discard O-rings.
2-68.2 INSTALLATION. Install elevator accumulator as
follows:
NOTE
Lubricate all packings and O-ring with
hydraulic fluid.
A.Position the clamps on the accumulator.
B.Position the accumulator on its support.
C.Hold the accumulator, then tight and lock the
clamps fixing the accumulator.
D.Place new O-rings on the inlet and outlet pipe and
connect it on the accumulator torque tighten the
nut on top of inlet and outlet pipe.
E.Place new O-rings on the nitrogen pipe and
connect it on the accumulator torque tighten the
nut on top of nitrogen pipe.
F.Connect the electrical cable.
G.Remove from the aircraft the container with
drained fluid.
(Cont'd)
27-30-70
2-509