TCH.1C-27J-2-27JG
2-68.2 INSTALLATION. Install elevator accumulator as
follows: (Cont'd)
CAUTION
––––––––––––––––––––––––––––––––––
Dont use the drained fluid collected to
refill hydraulic circuit.It is contamined,
discard it.
––––––––––––––––––––––––––––––––––
H.Install the cover plate on the left (right) fuselage
side ramp area.
FOLLOW ON MAINTENANCE:
1.Close thermal insulation screen.
2.Remove maintenance platform (AGE NO. 00074).
3.Enable cargo ramp and cargo door funciton.
4.Connect electrical power to aircraft (refer to manual
5.Restore hydraulic power system (refer to manual
6.Perform the funcional test HYDRAULIC
ACCUMULATORS SHUT-OFF VALVE CHECK(refer
to para
27-30-70
2-510