TCH.1C-27J-2-27JG
11.If the recorded value are not according to the diagram
(refer to figure
) , adjust control cable
as follow:
A.Insert rigging pins (1 and 33) in the rear and
forward quadrant (2 and 32).
B.Check the cable tension value using the tool for
measurement of control cable tension.
C.If necessary adjust cable tension by means of
turnbuckle (30 and 31).
D.Remove both rigging pins (1 and 33) from forward
and rear quadrant (2 and 32).
E.Finally Check the value of cable tension if is
according to the diagramm (refer to figure
27-50-15
2-566