TCH.1C-27J-2-27JG
FOLLOW ON MAINTENANCE:
1.Close the access panels 210E, 210F, 711A, 712A,
130B, 130C.
2.Install pilot seat (refer to manual
).
3.Restore hydraulic power system (refer to manual
4.Connect electrical power to aircraft (refer to manual
5.Perform the functional test:
A.FLAP CONTROL CABLE TENSION (refer to para
).
B.MEASUREMENT OF FLAP CONTROL FRICTION
FORCE (refer to para
27-50-45
2-603