TCH.1C-27J-2-27JG
2-95.2 INSTALLATION (refer to figure
)
and (refer to figure
) (Cont'd)
F.Replace the cotter pin (LCM NO. 00052) (33).
5.Replace the connection between the spoiler actuator
arm (23) LH (RH) and rod (27) in the following way:
A.Insert thet washer (22) in bolt (21).
B.Insert the bolt (21) in the connection of the spoiler
actuator arm (23) LH (RH).
C.Replace the washer (24).
D.Replace the nut (25).
E.Torque (AGE NO. 00054) tighten the bolt to 230 รท
260 in lb.
F.Replace the cotter pin (LCM NO. 00041) (26).
6.Connect return pipe (17) of the LH (RH) lift dumper
actuator to tee (8) in the following way:
A.Remove the plug of the pipe (17) and the plug of
the actuator.
B.Connect the pipe (17) to tee (8) and torque (AGE
NO. 00054) tighten nut.
7.Connect return hydraulic pipe (7) of the hydraulic
system No. 1 in the following way:
A.Remove the plug of the pipe (7) and the plug of the
actuator.
B.Connect pipe (7) to tee (8) and torque (AGE NO.
00054) tighten nut.
8.Connect return hydraulic pipe (15) of the hydraulic
system No. 2 in the following way:
A.Remove the plug of the pipe (15).
B.Connect pipe (15) to elbow (16) and torque (AGE
NO. 00054) tighten nut.
9.Connect supply hydraulic pipe (12) of the hydraulic
system No. 2 in the following way:
A.Remove the plug of the pipe (12).
(Cont'd)
27-60-10
2-687