TCH.1C-27J-2-29JG
WARNING
––––––––––––––––––––––––––––––––––
ENSURE THE RUDDER CAN MOVE
FREELY AND DOES NOT CAUSE INJURY
TO PERSONNEL.
––––––––––––––––––––––––––––––––––
3.Operate twenty times the rudder.
4.Annul the hydraulic pressure in the No.1 (No. 2)
hydraulic system.
5.Loosen the reservoir pressurization pipe nut (4).
6.Disconnect the hydraulic test stand (AGE NO. 00262)
and connect the hand pump (AGE NO. 00264) stand
to the suction ground test sockets (ground service
panel).
CAUTION
––––––––––––––––––––––––––––––––––
Avoid hydraulic fluid spilling using a
clean cloth. This will reduce fluid
leakage.
––––––––––––––––––––––––––––––––––
7.Operate the hand pump (AGE NO. 00264) until the
reservoir (2) is full (check on reservoir visual fluid level
indicator).
8.Verify that the reservoir visual fluid level indicator is on
"F" (Full) position.
9.Tighten the reservoir pressurization pipe nut (4) to 135
in lb thru 190 in lb (1.6 m kg thru 2.2 m kg) (AGE NO.
00054).
10.Disconnect the hand pump stand (AGE NO. 00264).
11.Connect hydraulic test stand (AGE NO. 00262) to No.
1 ( No. 2) system pressure and suction ground test
sockets (ground service panel).
29-10-05
2-69