TCH.1C-27J-2-29JG
PROCEDURE:
CAUTION
––––––––––––––––––––––––––––––––––
Make sure that No. 1 (No. 2) Hydraulic
System is filled and bled before you start
this functional test. This will prevent
damage to the equipment and loss of
mission effectiveness.
––––––––––––––––––––––––––––––––––
NOTE
Aim of the test described in this paragraph is
to verify the correct electro-hydraulic
functionality of the Hydraulic System.
NOTE
This procedure is valid for ACMP1. For
ACMP 2 is similar.
2-18.1 FUNCTIONAL TEST OF ALTERNATE CURRENT
MOTOR PUMP ACMP 1 (ACMP 2) -
FUNCTIONAL TEST (refer to figure
) , (refer to figure
figure
CAUTION
––––––––––––––––––––––––––––––––––
Before carrying out this functional test,
the hydraulic system No.1 (No.2) is
intended filled and bled.
––––––––––––––––––––––––––––––––––
1.Ensure that the ACMP 1 (ACMP 2) switches (4 and
5), on the Hydraulic/Smoke Detection Control Panel
(204VE) (1), is selected to OFF (guard raised).
2.Ensure that the following circuit breakers located on
Rear Lower Circuit Breakers Panel (455VE) are
closed :
A.HYD ACMP 2 (1DE) (16) located in position R 11;
(Cont'd)
29-10-20
2-126