TCH.1C-27J-2-29JG
2-20
EDP1 (EDP2) LINE ACCUMULATOR
NITROGEN CHARGING VALVE IN LH (RH)
ENGINE NACELLE - REMOVAL AND
INSTALLATION
INPUT CONDITION:
Aircraft Applicability:
04162, 04180
Required Conditions:
1.Disconnect external electrical power (refer to manual
2.Position maintenance platform (AGE NO. 00074).
3.Open the access panels 414D and 414J (424D and
424J).
Recomended Personnel:
PROCEDURE
MECH.
CODE
QTY
TOTAL TIME
(MIN.)
WORK
ZONE
Input Condition
AFM
2
20,00
Removal
AFM
1
5,00
Installation
AFM
1
22,00
Follow
Maintenance
AFM
2
20,00
Periodicity: AR - AS REQUIRED
Total Maintenance Time: 107 (Min.)
Total Time Detention System: 67 (Min.)
AGE Required:
AGE
No.
NOMENCLATURE
P/N
00054 Kit, torque wrenches
G0001200001-001**
00074 Kit, aircraft assy platform
G0005100001
29-10-25
2-139