TCH.1C-27J-2-29JG
2-21
LINE ACCUMULATOR IN LH MAIN LANDING
GEAR FAIRING - REMOVAL AND
INSTALLATION
INPUT CONDITION:
Aircraft Applicability:
04162, 04180
Required Conditions:
1.Disconnect external electrical supply from the aircraft
(refer to manual
) .
2.Open the access panel 912J located in the LH Main
Landing Gear fairing.
3.Remove the bolt (6), washers (5 and 4), castellated
nut (2) and cotter pin (3) on the lower side of the rod
(1) connecting the panel 912E (7) to fuselage
structure. Discard removed cotter pin.
4.Remove the anti-fod shield panel 912Q.
Recomended Personnel:
PROCEDURE
MECH.
CODE
QTY
TOTAL TIME
(MIN.)
WORK
ZONE
Input Condition
AFM
2
50,00
Removal
AFM
1
15,00
Installation
AFM
1
30,00
Test
AFM
1
60,00
Follow
Maintenance
AFM
2
50,00
Periodicity: AR - AS REQUIRED
Total Maintenance Time: 305 (Min.)
Total Time Detention System: 205 (Min.)
29-10-25
2-143