background image
TCH.1C-27J-2-29JG
2-21.2 INSTALLATION (refer to figure 
2-18, sheet 3/4
) ,
(refer to figure 
2-18, sheet 1/4
) , (refer to figure
2-18, sheet 2/4
) and (refer to figure 
2-18, sheet 4/4
) (Cont'd)
2.Install the new Packing (LCM NO. 00027) (13) on the
union reducer (14), install the union reducer (14) on
the inlet port of the accumulator (12). Torque tighten
(AGE NO. 00054) to 3,2 mkg thru 3,5 mkg (280 in lb
thru 305 in lb).
3.Install the new packing (LCM NO. 00027) (22) and the
retainer (LCM NO. 00026) (21) on the outlet TEE
reducer (19), install the outlet TEE reducer (12) on
outlet port of the accumulator (12).
4.Install the two metallic clamps (23) on the
accumulators (12).
5.Position the accumulator (12) and anchor the two
clamps (23) on supports.
6.Tighten the metallic clamp (23) lightly in order to hold
the accumulator (12).
7.Install the inlet pipe (15) and tighten the nuts.
8.Connect the sensing pipe (8) that connect the
accumulator (12) with the manometer and tighten the
nut.
9.Align the TEE reducer port with the pressure
transducer pipe (18). Verify correct installation.
Tighten the nut on the pressure transducer pipe (18).
10.Install the outlet pipe (17) between the two TEE
reducer (16 and 19) and tighten the nuts.
11.Verify correct installation of outlet pipes assy (17 and
18).
12.Torque tighten (AGE NO. 00054) the nut of TEE
reducer (19) on accumulator (12) to 3,2 mkg thru 3,5
mkg (280 in lb thru 305 in lb).
(Cont'd)
29-10-25
2-148