background image
TCH.1C-27J-2-29JG
2-22.2 INSTALLATION (refer to figure 
2-19, sheet 1/3
)
and (refer to figure 
2-19, sheet 2/3
) (Cont'd)
4.Install the two metallic clamps (20) on the accumulator
(19).
5.Position the accumulator (19) and anchor the two
clamps (20) on supports.
6.Tighten the metallic clamps (20) lightly in order to hold
the accumulator (19).
7.Tighten the nut of the inlet pipe (16) and tighten
lightly.
8.Connect the sensing pipe (4) that connect the
accumulator (19) with the manometer and tighten the
nut.
9.Install and tighten the P-clamp (3) using screw (2) and
washer (1).
10.Install the pipe (15) that connects accumulator Tee
union reducer (13) to flow selector valve (21). Align
the tee reducer port with the pipe and tighten the nuts.
Verify correct installation.
11.Install the outlet pipe (14) to the tee reducer (13) and
tighten the nut.
12.Verify correct installation of outlet pipes assy.
13.Torque tighten (AGE NO. 00054) the tee reducer nut
(12) on accumulator at 280 through 305 lb in.
14.Torque tighten (AGE NO. 00054) the nut (6) on
transducer pipe to 90 in lb thru 135 in lb (1.1 mkg thru
1.6 mkg).
15.Torque tighten (AGE NO. 00054) the outlet pipe nuts
to 143 in lb thru 215 in lb (1.6 mkg thru 2.4 mkg).
16.Torque tighten (AGE NO. 00054) the inlet side nut to
143 in lb thru 215 in lb (1.6 mkg thru 2.4 mkg).
17.Torque tighten (AGE NO. 00054) the sensing line pipe
nut to 90 in lb thru 135 in lb (1.1 mkg thru 1.6 mkg).
18.Tighten the two metallic clamps (20).
29-10-25
2-160