TCH.1C-27J-2-29JG
2-28.1 REMOVAL (refer to figure
) , (refer
to figure
) and (refer to figure
14.Remove from shut-off valve (10) the couplings (6 and
12) and the preformed packings (7 and 11). Discard
removed preformed packings.
2-28.2 INSTALLATION (refer to figure
(refer to figure
)
NOTE
Lubricate all elements with hydraulic fluid
before installation.
1.Install at the shut-off valve (10) the couplings (6 and
12) and the new preformed packings (7 and 11) (LCM
NO. 00045).
2.Install the shut-off valve (10) by using the three bolts
(16), washers (8 and 17) and nuts (9).
NOTE
Remove protection caps from the electrical
connectors and hoses to be installed.
3.Connect the nut of the pipe (14) and new preformed
packing (13) (LCM NO. 00045). Torque tighten (AGE
NO. 00054) nut to 120 in lb (1.4 mKg). Install the new
lock wire at the HYDRAFLOW.
4.Connect the nut of the pipe (4) and new preformed
packing (5) (LCM NO. 00045). Torque tighten (AGE
NO. 00054) nut to 120 in lb (1.4 mKg). Install the new
lock wire at the HYDRAFLOW.
5.Torque tighten (AGE NO. 00054) bolts (16) to 29 in lb
thru 33 in lb (0.3 mKg thru 0.4 mKg).
6.Connect electrical connector 39 DEA (38DEA) (15).
(Cont'd)
29-10-40
2-200