TCH.1C-27J-2-29JG
2-30.2 INSTALLATION (refer to figure
)
and (refer to figure
2.Select the ACMP 1 (ACMP 2) switch (10 and 11) to
ON position (cover down).
CAUTION
––––––––––––––––––––––––––––––––––
Avoid the hydraulic fluid spilling using a
clean cloth. This will prevent damage to
the equipment due to corrosion.
––––––––––––––––––––––––––––––––––
3.Tighten the low pressure switch (6) to tee pipe (1) by
screw nut (2).
4.Rotate the propeller by hand until the hydraulic fluid
flows free from bubbles.
5.Torque tighten (AGE NO. 00054) the pressure swittch
nut (2) to 135 in lb thru 190 in lb (1.6 mKg thru 2.2
mKg).
6.Install clamp (9) by using bolt (7), washer (8) and nut
(3) to the support (4).
7.Connect electrical connector (26DEA (27DEA)) (5) at
the low pressure switch (6) and install the new lock
wire.
FOLLOW ON MAINTENANCE:
1.Close the access panels 414J (424J) and 414D
(424D).
2.Remove maintenance platform (AGE NO. 00074).
3.Connect external electrical power (refer to manual
4.Perform the test:
A.FUNCTIONAL TEST OF LH(RH) ENGINE
NACELLE LOW PRESSURE SWITCH (refer to
).
29-10-50
2-213