TCH.1C-27J-2-29JG
1-5
BULKHEAD FITTINGS - GENERAL
MAINTENANCE
INPUT CONDITION:
Aircraft Applicability:
04113, 04114, 04116, 04119, 04130, 04131, 04132,
04133, 04134, 04135, 04136, 04137, 04162, 04180
Recomended Personnel:
PROCEDURE
MECH.
CODE
QTY
TOTAL TIME
(MIN.)
WORK
ZONE
Input Condition
AFM
1
1,00
Periodicity: AR - AS REQUIRED
Total Maintenance Time: 1 (Min.)
Total Time Detention System: 1 (Min.)
AGE Required:
None
Consumable Material Required:
None
Safety Conditions:
None
PROCEDURE:
1.Bulkhead fittings use the same method of connection
as MS couplings except for the fact that they must be
fixed to the bulkhead before being connected to the
pipe. For the installation of bulkhead fittings, refer to
T.O. 1-1A-8.
1-16