TCH.1C-27J-2-29JG
2-3.1
TUBE INSERTION MARKING BAND (Cont'd)
1.Select the appriopriate marking tool in accordance
with size of tubing to be swaged according to Table
2-2. If insertion tool is not available, refer to
dimensions "A" and "B" as per Table 2-2. and (refer to
figure
2.Contact lip stop of marking tool with end of tubing and
mark tube with proper pen through the slot at least
two places 180 ° apart, as per (refer to figure
) .
Table 2-1. Marking dimension
FITTING SIZE
TUBE O.D.
MARKING
TOOL
DIMENSIONS mm
inch.
mm
A
B
-4
1/4
6.35
DTL5302-013-
01
15.6
23.2
-5
5/16
7.94
DTL5302-013-
01
16.6
24.3
-6
3/8
9.52
DTL5302-013-
01
17.5
25.1
-8
1/2
12.70
DTL5302-031-
01
30.3
37.9
-10
5/8
15.88
DTL5302-031-
01
31.3
38.9
-12
3/4
19.05
DTL5302-031-
01
33.1
40.7
-16
1
25.40
DTL5302-040-
01
36.8
44.4
2-3.2
SWAGING PROCEDURE FOR 10.000 PSI
TOOLING
1.Before operating new tools, when the hose from the
power source to the tool is replaced or when a tool is
overhauled, an air bleed procedure is required.
Fittings to swaged shall not be removed from their
package until they are required for installation.
(Cont'd)
29-00-20
2-10