background image
TCH.1C-27J-2-27JG
Section/
Paragraph
Page
2-38 ECU (Q-FEEL/TLU) - REMOVAL AND
INSTALLATION (27-20-60)
 ....................................
2-303
2-39 ELEVATOR CONTROL SYSTEM - FUNCTIONAL
TEST (27-30-00)
 ..................................................
2-307
2-40 ELEVATOR CONTROL SYSTEM - FUNCTIONAL
TEST (27-30-00)
 ..................................................
2-317
2-41 ELEVATOR CONTROL CABLE TENSION -
ADJUSTMENT (27-30-05)
 .....................................
2-329
2-42 ELEVATOR TENSION REGULATOR - REMOVAL
AND INSTALLATION (27-30-05)
 ............................
2-338
2-43 ELEVATOR CABLE - REMOVAL AND
INSTALLATION (27-30-05)
 ....................................
2-351
2-44 ELEVATOR SURFACES, MEASUREMENT AND
PLAY - ADJUSTMENT (27-30-10)
 ..........................
2-360
2-45 PITCH TRIM CONTROL SYSTEM -
ADJUSTMENT (27-30-10)
 .....................................
2-378
2-46 ELEVATOR TRIM TRAVEL - OTHER CHECK
(27-30-10)
 ............................................................
2-386
2-47 ELEVATOR COMPONENTS - ADJUSTMENT
(27-30-15)
 ............................................................
2-396
2-48 CONTROL WHEEL - REMOVAL AND
INSTALLATION (27-30-15)
 ....................................
2-405
2-49 HYDRAULIC ACCUMULATORS SHUT-OFF
VALVE - FUNCTIONAL TEST (27-30-20)
 ...............
2-410
2-50 LH (RH) ELEVATOR ACTUATOR - REMOVAL
AND INSTALLATION (27-30-25)
 ............................
2-418
2-51 ELEVATOR TRIM POSITION TRANSMITTER -
REMOVAL AND INSTALLATION (27-30-30)
 ...........
2-427
2-52 ELEVATOR EMERGENCY TRIM ACTUATOR -
REMOVAL AND INSTALLATION (27-30-35)
 ...........
2-432
v