TCH.1C-27J-2-29JG
D.Operate the elevator aproximately 20 times.
E.Check for absence of leakage.
2.Perform the BLEENDING NO. 1 (NO. 2) System (refer
to para
) .
3.Select the ACMP 1 (ACMP 2) (24 and 25) switch to
OFF position.
4.Wait for five minutes and check the pre-charge
pressure on the manometer and, eventually, restore
the correct value 1450 psi (100 Kg/cm²).
5.Install the anti-fod shield panel 912Q.
6.Install the bolt (6), washers (5 and 4), castellated nut
(2) and new cotter pin (3) on the lower side of the rod
(1) connecting the panel 912E (7) to fuselage
structure.
7.Close the access panel 912J located in the LH Main
Landing Gear fairing.
8.Connect external electrical power (refer to manual
29-10-25
2-150